0
Shedoll Comprehensive Maintenance Guide|Daily Care & Damage Repair Protocols
2025-09-17
shedoll.com
Care & Maintenance
449

I. Daily Maintenance

1. Posture Management

  • Correct Placement:
    ✦ Always store in supine position with joints at neutral angles
    ✦ Reference included posture diagrams for optimal positioning
  • Critical Prohibition:
    ⚠️ Never maintain bent joint positions >30 minutes (see stress distribution diagrams)

2. Care Procedure

  • Talcum Powder Application:
    ✦ Use powder puff with dime-sized portion per limb
    ✦ Apply along muscle direction
  • Tool Specification:
    ✦ Exclusive use of fragrance-free talcum powder
  • Maintenance Frequency:
    ✦ Monthly full-body treatment 
    ✦ Texture comparison: Pre/post-care surface analysis

3. Critical Warnings

  • ⚠️ Joint Stress Zones: Highlighted bend points with max 30-min duration
  • ⚠️ Deformation Risks: Wrinkle progression diagrams + crack-prone area close-ups
  • Prohibited Actions:
    ✗ Prolonged joint bending
    ✗ Localized pressure on limbs

II. Damage Repair

1. Minor Surface Repair (<5cm)

  • Materials: Cyanoacrylate adhesive (e.g., 502 glue)
  • Operation Steps:
    ① Clean damaged area with lint-free cloth
    ② Align torn silicone to original position
    ③ Apply thin glue layer evenly
    ④ Cure undisturbed for 30+ minutes
  • Mandatory Notes:
    ⚠️ Only for surface-level damage
    ⚠️ Do not request refund - instead:
    ✦ Film HD close-up video
    ✦ Contact Shedoll CS for customized solution

2. Major Damage Protocol

  • Immediate Response:
    ✦ STOP all repair attempts
    ✦ Film 360° damage video (include macro shots)
  • Professional Service:
    ✦ Submit video to Shedoll customer service
    ✦ Receive custom repair plan based on damage assessment
    ✦ Technician intervention required
Cart
Your cart is empty
Continue shopping
{{ item.sku_code }} - {{ item.variant_label }} {{ item.item_type_label }}
{{ item.price_format }}
{{ item.subtotal_format }}
Total {{ totalAmount }}
Checkout View Cart